PHL-T series

PHL-T24 low-power power supply SPD is mainly used to protect field equipment and 24V power supply equipment in control room from lightning surge impulse voltage or operating overvoltage.

Request a Quote

PRODUCTS DETAILS

Features

The main features are as follows:                        

1. The protection module supports hot plugging and unplugging without interruption;                

2.12.4mm ultra-thin, saving space;                            

3. High bandwidth and low insertion loss, suitable for all kinds of signals;

Technical parameter

Parameter PHL-T24
Rated operational voltage 24VDC
Maximum operating voltage Uc 36VDC
Rated operating current  IL 16A
Response time 1ns
Leakage current <1uA
Nominal discharge current In (8 / 20μs) 10kA/wire
The maximum discharge current  Imax (8 / 20μs) 20kA/wire
Lightning surge current limp (10 / 350μs) 2 5kA/wire
Protection voltage Up(line-to-line) 85V
Protection voltage Up(line to ground) 600V

 

Temperature range -40°C ~ +80°C
Relative humidity 10%~95%
External dimensions (length x width x height) 90. OmmX 12. 4mmX 77. 5mm
Connection Screw wiring
Maximum cross-sectional area of the wire 2.5mm
Cross section area of guide rail grounding wire 4~6mm
Installation method DN35mm Rail

Outline dimension diagram

PHL-T Series .png

Functional schematic diagram

PHL-T Series(1) .png

Security certificate
 
Lightning protection performance test
Shanghai Lightning Protection Products Testing Center
Certification standard: GB/T 18802.21(IEC 61643-21)
Functional safety level: SIL3
 
National Industrial Automation Instrument Product Quality Supervision and Inspection Center
"Certification standard: GB/T 20438.1(IEC 61508-1)
                                     GB/T 20438.2(IEC 61508-2)"
 
Typical applications
PHL-T Series(2) .png
Wiring
 
(1)Instrument wiring is 2.5 screw terminal;
(2) The terminal can be connected with multi-strand copper wire with cross-sectional area of 0.2~2.5mm2 or single-strand copper wire with cross-sectional area of 0.2~4mm2 ;
(3)The length of wire stripping is about 5-8mm, which is locked by screws.
PHL-T Series(3) .png
Installation

The PHL-S.Ex series universal model adopts the DIN35mm guide rail installation method, and the steps are as follows:

⑴Clamp the upper metal at the bottom of the instrument on the DIN rail;
⑵Push the metal part at the bottom of the instrument into the guide rail;
⑶Suggest using copper or steel rails.

PHL-T Series(4) .png

Disassembly

(1)Insert a screwdriver (blade width ≤ 3.5 mm) into the groove at the bottom of the instrument panel;
(2) Push the screwdriver upwards to pry up the metal latch;
(3)Pull the instrument down and out of the guide rail.

PHL-T Series(5) .png

Maintenance

(1) When using SPD, there must be reliable grounding;
(2) Before the SDP is electrified and debugged, it is necessary to check again whether the connection between the input and output terminals is correct;
(3) The products have undergone strict inspection and quality control before leaving the factory. If you find that the work is abnormal and suspect that the internal module is faulty, please contact the nearest agent or directly contact the technical support hotline in time;
(4) Within one year from the date of delivery, any product quality problems during normal use shall be repaired by Beijing Pinghe free of charge.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours

Leave YourMessage

Thank you! We will reply you via email within 24 hours.

return